-
Notifications
You must be signed in to change notification settings - Fork 222
Pull requests: openshift/microshift
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
NO-ISSUE: Standardize wait timeout usage for oc commands
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
OCPBUGS-77940 Reject custom feature gates when FeatureSet is empty
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#6319
opened Mar 6, 2026 by
agullon
Loading…
2 tasks
USHIFT-6547: Add RHEL 10 CI lane
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6318
opened Mar 6, 2026 by
vanhalenar
•
Draft
NO-ISSUE: rebase-release-4.22-4.22.0-0.nightly-2026-03-05-070435_amd64-2026-03-05_arm64-2026-03-06
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
tide/merge-method-squash
Denotes a PR that should be squashed by tide when it merges.
verified
Signifies that the PR passed pre-merge verification criteria
#6317
opened Mar 6, 2026 by
microshift-rebase-script
bot
Loading…
USHIFT-6636: Change test-agent impl to align with greenboot-rs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
USHIFT-6073: Add "from previous Z" upgrade path on releases scenarios
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6305
opened Mar 4, 2026 by
agullon
Loading…
USHIFT-6674: Switch release scenarios to RHEL 10.2
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6304
opened Mar 4, 2026 by
vanhalenar
•
Draft
introduce Curves configuration to Ingress
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/invalid-owners-file
Indicates that a PR should not merge because it has an invalid OWNERS file in it.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
USHIFT-6523: Switch bootc release images and scenarios to RHEL 9.8
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6274
opened Feb 25, 2026 by
ggiguash
Loading…
USHIFT-6586: introduce tls-scanner test to optional suite
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6266
opened Feb 23, 2026 by
eslutsky
Loading…
USHIFT-6491: Improve gitops test
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#6116
opened Jan 20, 2026 by
agullon
Loading…
OCPEDGE-2038: Add promote-learner command
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
ProTip!
Updated in the last three days: updated:>2026-03-04.